Term
| a master stream exceeds what gpm |
|
Definition
|
|
Term
| what is the number 1 priority of engine and truck companies respectivly. |
|
Definition
Locate the fire p101 rescue p109 |
|
|
Term
| Ladders to the roof should extend how many rungs above the roof |
|
Definition
|
|
Term
| Interior doors that open outward mean what |
|
Definition
Dwellings means a closet Commercial means utility area |
|
|
Term
| what must FF's be taught to do when they hear the sound of breaking glass |
|
Definition
| Slope their shoulders downward to allow glass to slide off |
|
|
Term
| a vent hole should be done with the wind to the back and preferabley 1 large hole of what size |
|
Definition
4x4 small roof 8x12 large roof |
|
|
Term
| How do you use a nozzle to hydraulically ventilate |
|
Definition
| fog pattern covering 90% of opening |
|
|
Term
when can a trench cut be attempted
where should the observation hole be cut |
|
Definition
after the initial vent hole is cut
Between the initial hole and a location near where the trench will be placed |
|
|
Term
| observation holes can be of any shape the most common are? |
|
Definition
Kerf(a single blade cut( Triangular |
|
|
Term
| Trench cuts should be how far apart and where should perpendicular cuts be made |
|
Definition
| 30-36 inches apart with perpendicular cuts every 3 feet |
|
|
Term
| On scene when should the power saw first be started |
|
Definition
|
|
Term
| Fire resistive construction is what type |
|
Definition
|
|
Term
| Noncombustable/Limited combustible is what type of construction |
|
Definition
|
|
Term
| Ordinary is what type of construction |
|
Definition
|
|
Term
| Heavy timber is what type of construction? |
|
Definition
|
|
Term
| frame construction is considered what type of construction? |
|
Definition
|
|
Term
| frame construction is considered what type of construction? |
|
Definition
|
|
Term
| When steel is heated it expands how much? |
|
Definition
| 9.5 inches per 100 feet. A rule of thumb is 1 inch expansion for every 10 feet of material |
|
|
Term
|
Definition
| steel decking on steel bar joist, layered on top with insulation roofing paper,tar seal, gravel. |
|
|
Term
| What is a common problem in Built type roofs when the tar vapor seal is heated up? |
|
Definition
| The tar breaks down in a flamable Gas and can burn on the underside of the roof undetected |
|
|
Term
| Steel bar joists can be how far apart |
|
Definition
|
|
Term
|
Definition
| A 30 degree cut on the end of each joist, which allows the floor to collapse without pushing the walls out |
|
|
Term
| what are the two types of wood truss construction and how are they defined? |
|
Definition
| Lightweight and Timber Truss which is caracterized by a minimum size of 4X6. |
|
|
Term
| what id the most important factor in determining whether a building will fail under fire conditions |
|
Definition
|
|
Term
What is the weakest point on a truss roof.
What is the major problem with the use of steel in truss construction |
|
Definition
Anchor points especially where hey don't contact the wood
It will fail readily under fire conditions |
|
|
Term
| Metal surface fasteners (Gusset plates) will fail when the depth of char exceeds |
|
Definition
|
|
Term
| What are the three basic types of wall Collapse |
|
Definition
90 Degree
Inward outward
Curtain
p196 |
|
|
Term
| What percentage of a walls height is used to predict its Collapse zone |
|
Definition
|
|
Term
| What is the type of collapse that causes the most firefighter injuries |
|
Definition
Localized interior collapse
p213 |
|
|
Term
| What is a prime consideration in Shoring operations |
|
Definition
| Do not force the shoring in place p228 |
|
|
Term
| what are the ornamental plates that can be seen on the exterior of an exterior wall usually type 3 const |
|
Definition
|
|
Term
| What does plaster sliding off the walls indicate and what should happen if you see this. |
|
Definition
| Its caused by a twisting movement of the building and warns of collapse imminent. Evacuate immediately |
|
|
Term
| What are the 4 types of floor collapse |
|
Definition
pancake
V-type
lean to
unsupported floor collapse
p227 |
|
|
Term
| How does OSHA define an IDLH atmosphere |
|
Definition
| Fires that are beyond the incipient stage Immediately dangerous to life and health. p244 |
|
|
Term
| Can firefighters be inside a structure and still be in compliance with two in Two Out. |
|
Definition
| Yes because the rule governs entry into an IDLH not a structure per se. p244 |
|
|
Term
| Explain first in first out |
|
Definition
| The first arriving unit is the first to leave the scene. This Allows for even workload, due to fatigue. p248 |
|
|
Term
| What is the role of the safety Officer |
|
Definition
| To observe operations and act as a risk manager. p231 |
|
|
Term
| Most 30 minute scba cylinders have how much usable air. |
|
Definition
|
|
Term
| A PAR (personnel accountability report) should be taken when |
|
Definition
| Routinely to insure accuracy of where personnel are operating and during drastic changes:building collapse, shift from offense to defense, emergency evac. p244 |
|
|