Term
| Limit for UNIDENTIFIED Leakage |
|
Definition
|
|
Term
| Limit for IDENTIFIED leakage |
|
Definition
|
|
Term
| Limit for CONTROLLED leakage |
|
Definition
|
|
Term
| Limit for Primary to secondary leakage |
|
Definition
|
|
Term
| Where does reactor vessel head leakoff drain to? |
|
Definition
|
|
Term
| Requirements to open a Tcold loop stop valve |
|
Definition
- Associated Thot loop stop closed
- Auctioneered High Thot within 20F of low Thot
- Auctioneered High Tcold within 20F of low Tcold
- Both High Tcold and High Thot <170F
- 200 psid max pressure allowed
|
|
|
Term
| Open permissive of a Hot leg stop |
|
Definition
Associated cold leg stop closed
and
max 200 psid |
|
|
Term
| What inputs into each loop Tave circuit? |
|
Definition
- The average of 3 narrow range Thot indicators
- 1 narrow range Tcold indicator
|
|
|
Term
| What chemical is used to increase pH in the RCS? |
|
Definition
|
|
Term
| Loop 1 cold leg penetrations |
|
Definition
- SI/RHR/Accum
- CHG and SI
- Normal Charging
- Pzr spray
|
|
|
Term
| Loop 2 cold leg penetrations |
|
Definition
- Pzr spray
- SI/RHR/Accum
- Charging and SI
|
|
|
Term
| Loop 3 cold leg penetrations |
|
Definition
|
|