Term
|
Definition
| Environmental Product Declaration |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
| What does a PCR (product category rule) do? |
|
Definition
| They define scope, system boundary, measurement procedures, impact measures, and other technical requirements for EPDs. |
|
|
Term
| What does a Type III EPD have? (Define Type III) |
|
Definition
| Third Party certification |
|
|
Term
| What is a "cradle to gate" assessment? |
|
Definition
| Analysis of part of a product's life from resource extraction (cradle) to gate (before it is transported for distribution and sale). |
|
|
Term
| What is the building enclosure? |
|
Definition
| Exterior layer of a building that protects interior areas from outside plus semi exterior layer (layer that protects conditioned from unconditioned space) |
|
|
Term
| What are the 6 categories valued in EPD product optimization? (MRC BPDO; O2) |
|
Definition
| global warming potential, depletion of stratospheric ozone layer, acidification of land and water sources, eutrophication, formation of tropospeheric ozone, and depletion of nonrenewable energy resources |
|
|
Term
|
Definition
| The process by which a body of water becomes nutrient rich thereby becoming a fertile environment for aquatic plant growth, which results in depletion of dissolved oxygen. (Runoff kills fish/mollusks) |
|
|
Term
| What kinds of material are excluded from the calculation for MRC Construction and Demo Waste Mgmt Option 1 - Diversion? |
|
Definition
| hazardous materials, alternative daily cover (ADC), land clearing debri, excavated soil |
|
|
Term
| What guide provides insight on the integrative process necessary for healthcare project prereqs? (Integrative Project planning and design) |
|
Definition
| ANSI Consensus National standard Guide 2.0 |
|
|
Term
| What are the 7 allowable sources of renewable energy for EA Credit Renewable energy production? |
|
Definition
| PV, Solar thermal, Wind, Biofuel (not all sources), low impact hydro, wave/tidal, geothermal energy (excluding GSHPs) |
|
|
Term
| What biofuels are ineligible for contributing to the EA Credit for Renewable Energy production? |
|
Definition
| Municipal solid waste, forest biomass, wood coated with paint/plastic/laminate, treated wood (preservative) |
|
|
Term
| What tool should you use to calculate the 95th percentile rainfall event for SS Credit Rainwater Mgmt? |
|
Definition
| The USGBC Rainfall Events Calculator |
|
|
Term
| What database does the USGBC rainfall events calculator source from? |
|
Definition
| The National Climatic Data Center Database |
|
|
Term
| When should energy modeling be used during a project? Why? |
|
Definition
| Early in the design process so that it can be used as a design tool rather than a compliance check |
|
|
Term
| What does SRI stand for? (SS Credit for heat island redux) |
|
Definition
|
|
Term
| What ratio is considered to be a low sloped roof? (SS Credit for heat island redux) |
|
Definition
|
|
Term
| What is the threshold for the initial SRI of a low sloped roof? (SS Credit for heat island redux) |
|
Definition
|
|
Term
| What is the threshold for the initial SRI of a steep sloped roof? (SS Credit for heat island redux) |
|
Definition
|
|
Term
| What is the threshold for the 3 year SRI of a low sloped roof? (SS Credit for heat island redux) |
|
Definition
|
|
Term
| What is the threshold for the 3 year SRI of a steep sloped roof? (SS Credit for heat island redux) |
|
Definition
|
|
Term
| What is the average lease up rate for green buildings? |
|
Definition
|
|
Term
| What EQ Credit requires photos? |
|
Definition
| Construction IAQ Management plan requires photos that implement IAQ practices |
|
|
Term
| What are scope 1 emissions? |
|
Definition
| Emissions produced directly by the entity |
|
|
Term
| What are scope 2 emissions? |
|
Definition
| Emissions produced by the energy purchased by the entity. Includes losses do to transmission of HW, CHW, or steam utilities. Does not include losses in transmission of electricity. |
|
|
Term
| Can the green power and carbon offsets credit be pursued at any point in the project? |
|
Definition
|
|
Term
| Is the green power and carbon offsets credit calculated based on the quantity of energy consumed or the cost of energy consumed? |
|
Definition
|
|
Term
| How is the quantity of energy consumed calculated in order to know the cost of carbon offsets to purchase? |
|
Definition
| From scope 1 and scope 2 emissions. |
|
|
Term
| What parameters must match in between a baseline building and a proposed building to perform an LCA assessment? |
|
Definition
| LCA Scope, size, function, orientation, location (Climate zone), operating energy efficiency |
|
|
Term
| For EQ Credit Daylight option 3, how many daylight measurements must be taken after the building is occupied? |
|
Definition
|
|
Term
| When calculating indoor water use, does a private fixture or public fixture use more water? And which should be used if it is unclear if a fixture is one or the other |
|
Definition
|
|
Term
| What percentage parking reduction is required for projects that do not earn points for LT Credit Surrounding density and Diverse Uses or the LT Credit Access to quality transit? |
|
Definition
|
|
Term
| What percentage parking reduction is required for projects that DO earn points for LT Credit Surrounding density and Diverse Uses or the LT Credit Access to quality transit? |
|
Definition
| 40%. If they earn a point for either or then they qualify. |
|
|
Term
| If a project provieds off-street parking, what percentage of spaces must be reserved for car pool? |
|
Definition
| 5% of the quanity of spaces after reductions for earning or not earning a credit for either Surrounding Density and Diverse uses or Access to quality transit |
|
|
Term
| What is an ECM and what is it used for? |
|
Definition
| Exceptional calculation method. Used for whole-building energy modeling. |
|
|
Term
| What three HVAC strategies must be included in the design of a building less than 100K sq ft to comply with option 3 for EA Prereq Minimum energy performance? |
|
Definition
| SAT Reset (VAV), Premium economizer performance, variable speed fan control |
|
|
Term
| What building service must be taken into account in order to comply with ASHRAE 50% and therefore achieve option 2 for EA Prereq Minimum energy performance? |
|
Definition
| HVAC and heating hot water service |
|
|
Term
| What are the MPRs for a project to be eligible to earn LEED accreditation? |
|
Definition
1. Permanent location 2. Reasonable LEED boundaries (i.e. include contiguous land and land altered as a result of construction) 3. Must meet size requirements |
|
|
Term
| What is the minimum size requirement for a project to be eligible for LEED BD+C & O+M Certification? |
|
Definition
|
|
Term
| What is the minimum size requirement for a project to be eligible for LEED ID+C? |
|
Definition
|
|
Term
| What is the minimum size requirement for a project to be eligible for LEED for Neighborhood Development? |
|
Definition
| Should contain at least 2 habitable buildings and be no larger than 1500 acres |
|
|
Term
| What is the minimum size requirement for a project to be eligible for LEED Homes? |
|
Definition
| project must be defined as a dwelling by all applicable codes. |
|
|
Term
| Are manual demand response events eligible for LEED credits? |
|
Definition
|
|
Term
| What percentage of a building must be reused to earn exemplary performance? |
|
Definition
|
|
Term
| Can a project earn exemplary performance for purchasing products within a certain radius? |
|
Definition
|
|
Term
| How many products must a project source from 5 different manufacturers to earn exemplary performance? |
|
Definition
|
|
Term
| How many different manufacturers must a project source 40 different products from to earn exemplary performance? |
|
Definition
| 5 different manufacturers |
|
|
Term
| What percentage must a new construction building improve on the baseline to meet the EA prereq for minimum energy performance? |
|
Definition
|
|
Term
| What percentage must major renovation improve on the baseline to meet option 1 EA prereq for minimum energy performance? |
|
Definition
|
|
Term
| What percentage must a core and shell building improve on the baseline to meet option 1 EA prereq for minimum energy performance? |
|
Definition
|
|
Term
| If a pilot credit is not part of the rating system you are using can it be pursued as an innovation credit? |
|
Definition
|
|
Term
| For LT Credit Bicycle Facilities (residential), what percentage of regular building occupants must be used in the calculation for long term bike storage spaces? |
|
Definition
|
|
Term
| For LT Credit Bicycle Facilities (residential), what percentage of visitors must be used in the calculation for short term bike storage spaces? |
|
Definition
|
|
Term
| What is the minimum number of short term bike storage spaces for a residential building pursuing the LT Credit Bicycle Facilities? |
|
Definition
|
|
Term
| What is the minimum number of long term bike storage spaces for a residential building pursuing the LT Credit Bicycle Facilities? |
|
Definition
|
|
Term
| For LT Credit High-Priority Site in an urban area, what is one way to maintain/enhance the character of the local community? |
|
Definition
| Build in an historic area |
|
|
Term
| What is a typical way to achieve an IN Credit? |
|
Definition
| Double the requirement for an existing credit or achieve the next incremental percentage threshold |
|
|
Term
| What tool is used to calculate a landscape water budget? |
|
Definition
| the EPA Watersense Water Budget Tool |
|
|
Term
| Are hardscapes included in calculating a landscape water budget? |
|
Definition
|
|
Term
| Are vegetated areas used in calculating a landscape water budget? |
|
Definition
| Yes. Only vegetated areas are used |
|
|
Term
| What are 2 examples of unvegetated softscapes? |
|
Definition
| mulched paths and playgrounds |
|
|
Term
| Are unvegetated softscapes used in calculating a landscape water budget? |
|
Definition
|
|
Term
| Can furniture be included in MR Credits? |
|
Definition
| Yes, at the project team's discretion. If it is included then it must be included in ALL MR credits. |
|
|
Term
| What are the 3 phases of the integrative process? |
|
Definition
| Discovery/ Occupacny, operations, and performance feedback/Design and Construction (Implementation) |
|
|
Term
|
Definition
| Landscape water requirement |
|
|
Term
| What are the 3 factors used to calculate a landscape water requirement (LWR)? |
|
Definition
| Plant density, plant type, and irrigation needs. |
|
|
Term
| What is an LWR (landscape water requirement)? |
|
Definition
| The amount of water that a landscape requires for the site's peak watering month |
|
|
Term
| What types of test are used for smaller building envelope commissioning? |
|
Definition
|
|
Term
| What type of tests are used for larger building envelope commissioning? |
|
Definition
| Field mock up or thermal imaging |
|
|
Term
| If a cooling tower is going to reuse water from rainwater collection and storm water pond collection which will require less pre-treatment? |
|
Definition
|
|
Term
| Can commingled waste be used to get the MR Construction Waste Reduction Credit? |
|
Definition
| Yes. But the waste sorting facility must report their diversion rate to the project team for use in calcs. |
|
|
Term
| Can a wetland buffer be affected by a project that is trying to earn the LT Credit for Sensitive Land Protection? |
|
Definition
| Yes, a wetland buffer can be improved upon. |
|
|
Term
| Where should signage be posted outside a building to notify entrants of a no smoking policy? |
|
Definition
| Within 10 feet of all entrances |
|
|
Term
| If a project is trying to achieve the prereq WE Credit for Indoor Water Use Reduction and choose the prescriptive achievement path, what must be rue about all fixtures installed? |
|
Definition
| They must all be at or below watersense maximum levels |
|
|
Term
| Why would a project team going for the prereq WE Credit for Indoor Water Use Reduction choose path two usage based calculation? |
|
Definition
| If some fixtures do not meet the watersense maximum levels then the team should choose path two usage based calculation because in that case, if aggregate of all fixtures is less than watersense maximums the credit will be achieved |
|
|
Term
|
Definition
| Floor-area-ratio. Total non-residential floor area divided by the total building land area |
|
|
Term
| For SS Credit Site Development - Protect or Restore habitat, option 2 financial support, how much financial support would an owner have to provide to earn the credit? |
|
Definition
| $0.40 per sq ft of total site area |
|
|
Term
| For LT Credit Surrounding density and diverse uses, what is the minimum number of uses? |
|
Definition
|
|
Term
| For LT Credit Surrounding density and diverse uses, can a use type count more than once? |
|
Definition
| A use type only counts once (retail store that has a nail salon only counts once) |
|
|
Term
| For LT Credit Surrounding density and diverse uses, how many different categories of uses must be included? |
|
Definition
| Uses must come from at least 3 of the 5 categories, exclusive of the building's primary use |
|
|
Term
| For LT Credit Surrounding density and diverse uses, can 3 of the same type count as 3 different uses? |
|
Definition
| No more than two uses of each type (máximo of 2 restaurants for example) |
|
|
Term
| For LT Credit Surrounding density and diverse uses, can a planned project in the area count? |
|
Definition
| Uses that are planned count if they are available within one year of LEED occupancy |
|
|
Term
| Name 3 elements of a building that indirectly impact global warming |
|
Definition
| Building orientation, roof SRI, use of natural refrigerants |
|
|
Term
| For MR Credit Building Life-Cycle Impact Reduction, what is the maximum percentage of unsafe structures in a building that can be demolished and still be eligible for the credit? |
|
Definition
|
|
Term
| For MR Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials, how old does reused furniture have to be to be eligible for the credit? |
|
Definition
| Proven to be purchased at least 2 years prior to project initiation |
|
|
Term
| For EQ Credit Interior Lighting, what level of occupant controls must a light switch have? |
|
Definition
|
|
Term
| What is defined as mid-level in 3-tier occupant lighting control? |
|
Definition
| 30% to 70% of maximum illumination level |
|
|
Term
| What does it mean to be an infill site? |
|
Definition
| the land must have been previously developed to at least 75% |
|
|
Term
| Where should outdoor air intakes be located to achieve the best exterior contaminant prevention? |
|
Definition
| 1/3rd of the way up the building |
|
|
Term
| What are some examples of ways to analyze the LCA design of a building? |
|
Definition
| Alter footprint/shape of building, evaluate different types of structural elements, further define installed products and assemblies, optimize structural system |
|
|
Term
| For EQ Credit Enhanced IAQ Strategies, what types of rooms must be monitored for CO2 concentrations? |
|
Definition
| Only densely populated rooms like conference rooms |
|
|
Term
| What is considered exemplary performance for EQ Credit Quality Views? |
|
Definition
| 90% for all regularly occupied spaces |
|
|
Term
| If an international project has no access to watersense labelled products or an acceptable substitute what percentage below the baseline must fixtures and fittings to earn WE Prerequisite Indoor Water Use Reduction? |
|
Definition
|
|
Term
| What lighting is exempt from SS Light Pollution reduction? |
|
Definition
| Signal/directional/marker lighting for transportation, facade/landscape lighting (turned off midnight to 6am), theatrical/stage, roadway, hospital emergency including helipads, national flag, internally illuminated signage |
|
|
Term
| What are regional priority credits? |
|
Definition
| Bonus points that a project can earn for addressing environmental issues specific to their locale like water shortages or assets like high solar potential |
|
|
Term
| What are some methods to reduce the impact of internal loads (heat produced by things inside a building like people and lights)? |
|
Definition
| decreased lighting power, daylighting, reduce plug loads, economizer mode on HVAC, reduce OA requirements during low occ times with CO2 sensors |
|
|
Term
| What are some required items that must be completed prior to EQ Credit IAQ Assessment? |
|
Definition
Install all finishes and furniture For residential projects, install owner-provided furniture Complete punch-list items that would generate VOCs or other contaminants Test and balance the HVAC system |
|
|
Term
| For SS Credit Site Dev - Protect and restore habitat, what percentage of previously developed area is required to be restored? Does a green roof count towards this percentage? |
|
Definition
| 30%. Yes. Subtract a green roof area from 30% of the previously developed floor area. |
|
|
Term
| what is the minimum combined surrounding density of buildable land for LT Credit Surrounding Density and Diverse Uses Option 1 Surrounding Density? |
|
Definition
|
|
Term
| What is the threshold for building reuse in the MR Credit building life-cylce impact redux? |
|
Definition
|
|
Term
| What is a walkshed boundary? |
|
Definition
| A map that shades the area within walking distance of a project. For schools the area will be dependent on age and grade level |
|
|
Term
| What is the percentage of students that must live inthin walking distance of a school to earn the LT Credit Access to Quality transit? |
|
Definition
|
|
Term
| Can car pool and green vehicles spaces be combined for the credits for reduced parking footprint and green vehicles? |
|
Definition
| If 10% of capacity is reserved then yes |
|
|
Term
| How does a building qualify for the EA Credit Green power and carbon offsets? |
|
Definition
| Must buy 50% renewable power for 5 years |
|
|
Term
| If multiple stops of a railway are within walking distance of a project can you count more than one? |
|
Definition
|
|
Term
| How many pts does a project earn for the EA Credit Green Power and Carbon Offsets credit if it is a net zero energy user? |
|
Definition
|
|
Term
| What is a key component of the IP Credit Intergrative process? |
|
Definition
| Using non potable water sources |
|
|
Term
| Use drawing a radius a good way to calculate a bicycle network? |
|
Definition
| No. a vicinity map showing the bicycle network, route, and distance along the network to eligible destinations |
|
|
Term
| What are Some areas can be included/excluded at the project teams' discretion in calculating a water budget? |
|
Definition
Athletic field Vegetated playground Food garden Urban agricultural area |
|
|
Term
| What are some areas that must be excluded when calculating a water budget? |
|
Definition
Hardscapes (pervious or impervious) Unvegetated softscapes (mulched paths, playground areas) |
|
|
Term
| Using a smart controller in an irrigation system gets a project __% reduction in LWR (landscape water reqs) for WE Credit Outdoor Water Use Reduction |
|
Definition
|
|
Term
| If a project includes a parking structure with a roof and the roof has shaded parking spaces on it, is it still calculated as a roof in heat island calcs? |
|
Definition
|
|
Term
| What are the requirements for SS Credit Site Development - Protect & Restore Habitat? |
|
Definition
| Preserve/rpotect 40% of exiting greenfield area AND choose 1 of 2: restore 30% of all previously developed site or provide monetary financial support |
|
|
Term
| Is forest biomass considered a biofuel? |
|
Definition
|
|
Term
| For EA Credit green power/carbon offsets, what is the percentage threshold for 1 point? |
|
Definition
|
|
Term
| For EA Credit green power/carbon offsets, what is the percentage threshold for 2 points? |
|
Definition
|
|
Term
| Is there exemplary performance for EA Credit Green power/carbon offsets? |
|
Definition
|
|
Term
| Are there any exemplary performance opportunities for opportunities for EQ Credit interior lighting? |
|
Definition
| Neither option 1 lighting control nor option 2 lighting quality have exemplary performance |
|
|
Term
| What are the 3 percentage thresholds for spatial daylight autonomy? |
|
Definition
| 55%, 75%, and 90% (Healthcare only) |
|
|
Term
| What percentage of all regularly occupied areas must get "views" for the EQ credit Quality views to earn exemplary performance? |
|
Definition
|
|
Term
| Do bicycle parking spaces count as parking spaces within a project boundary? |
|
Definition
|
|
Term
| For SS Credit Heat island redux, what percentage of spaces must be covered? |
|
Definition
|
|
Term
| What is the minimum number of long term bike parking spaces for a residential project? (LT Credit Bicycle Facilities) |
|
Definition
|
|
Term
| What is the minimum number of short term bike parking spaces for a residential project? (LT Credit Bicycle Facilities) |
|
Definition
| 2.5% of peak visitors, but no fewer than 4 spaces per building |
|
|
Term
| What percentage of residents must get a bike parking space in a residential projects? (LT Credit Bicycle Facilities) |
|
Definition
| 30% but no less than 1 space per unit |
|
|
Term
| How is LT Credit Surrounding Density and Diverse Uses documented? |
|
Definition
| NO RADIUS INVOLVED. Include a map showing the project site, location, type of each use, and woalking routes from the main entrance to each use |
|
|
Term
| What percentage of spaces must be preferred parking for LT Credit Green Vehicles? |
|
Definition
|
|
Term
| What percentage of spaces must be EVSE parking for LT Credit Green Vehicles? |
|
Definition
|
|
Term
| What is an LWR and what factors are used to calculate it? |
|
Definition
LWR=landscape water requirement Plant type, plant density, and irrigation needs are used to calculate it |
|
|
Term
| For LT Credit surrounding density and diverse uses, what is the minimum number of uses needed to earn the credit? |
|
Definition
| minimum number of 4 uses, but a use type only counts once, must come from 3 out of 5 categories, no more than 2 uses of each type, planned uses count if they are available within one year of LEED occupancy |
|
|
Term
| For LT Credit Sensitve land protection, how many feet must undeveloped and developed land be from wetlands? |
|
Definition
|
|
Term
| For LT Credit Sensitve land protection, how many feet must a site be from a water body? |
|
Definition
|
|
Term
| When does the integrative process take place during a project? (Integrative Process Credit) |
|
Definition
| Takes place in pre-design and requires a simple box energy model |
|
|
Term
| What is an easy way to remember the LT Credit LEED ND Location? |
|
Definition
| Anything that says Stage X or Condititional is ineligible? |
|
|
Term
| For EA Credit Enhanced CX, when does the building operations need to be reviewed? |
|
Definition
| 10 months after substantial completion |
|
|
Term
| Is the OPR used to create the BOD or the other way around? |
|
Definition
| The owner's project requirements are used to create the BOD |
|
|
Term
|
Definition
|
|
Term
| What two fundamentals elements of a project should be documented during a goal setting work shop? (IP Credit Integrative Process) |
|
Definition
|
|
Term
| If a project is in a country where watersense labels aren't used and no acceptable substitute how can they still achieve the WE prerequisite Indoor water use reduction? |
|
Definition
| The project must comply with the fixture performance requirement for water use at least 20% below baseline requirements |
|
|
Term
| Where can the International Water Labelling Program outline Watersense substitutes be found? |
|
Definition
|
|
Term
| For EQ Credit IAQ Assessment, what is the minimum OA delivery rate post-occupancy? |
|
Definition
|
|
Term
| If a pilot credit is used in one rating system, can it be earned using another rating system? |
|
Definition
|
|
Term
| Why should a project team perform a site inventory and site analysis? (IP Integrative process) |
|
Definition
| Assessment (inventory+analysis) is completed early in the project so the project team can use it to spot synergies with other LEED credits |
|
|
Term
| What credit does having a LEED AP on the project team contribute to? |
|
Definition
|
|
Term
| If furniture is moved from an old office to a new site, when must it have been purchased to count toward MR Credit BPDO - Sourcing of Raw Materials? |
|
Definition
| 2 years prior to date of project registration |
|
|
Term
| When can the green power and carbon offsets credit be pursued? |
|
Definition
| At any point during the project |
|
|
Term
| For the IP credit's implementation component, what are the 3 types of water demand components and how many need to be offset by non-potable water usage? |
|
Definition
| indoor, outdoor, and process. Must offset 2 types. |
|
|
Term
| Which prequisites are affected by the IP Credit's implementation component? |
|
Definition
| WE Preq indoor water use redux and WE Prerequesite outdoor water use redux |
|
|
Term
| Is using wood waste as biofuel an acceptable means of reuse/recycling if waste diversion is not available? |
|
Definition
|
|
Term
| What are some methods of reducing internal loads in a building? |
|
Definition
| Reducing lighting loads, add daylighting, reduce plug loads, economizer settings on HVAC, reduce OA requirements by using CO2 based occupancy control |
|
|
Term
| What are some causes of internal loads? |
|
Definition
| Cooling loads, heat created by lighting/occupants, OA conditioning |
|
|
Term
| How many points can be earned for MR Credit Building Life Cycle Impact Reduction and what percentage of an historic building must be reused to get that many points? |
|
Definition
| You can earn 5 points by reusing any percentage of an historic building as long as any demo does not cause it to lose its historic status (option 1 historic building reuse) |
|
|
Term
| For SS Credit Site Development - Protect or Restore Habitat, Option 2 Financial Support, how many $/sq ft must the owner contribute to earn the credit? |
|
Definition
| $0.40 per sq ft of total building footprint |
|
|
Term
| When calculating reverberation times for acoustic analysis, what materials need to be included? |
|
Definition
| Include all finish materials in the rooms and their surface areas |
|
|
Term
| For WE Credit water metering which water subsystems have 100% of the source submetered? |
|
Definition
| Boiler water and reclaimed water |
|
|
Term
| For LT Credit High Priorty Site Option 1 Historic District where must the site be located? |
|
Definition
| an area where the percentage of previously developed land is at least 75% aka an infill site |
|
|
Term
|
Definition
| an area where the percentage of previously developed land is at least 75% |
|
|
Term
| For MR Credit BPDO - Material Ingredients - Option 1 Material Ingredient Reporting what levels of Cradle to Cradle must the product have been certified to? |
|
Definition
|
|
Term
| For MR Credit BPDO - Material Ingredients - Option 2 Material Ingredient Optimization what levels of cradle to cradle must the product have been certified to? |
|
Definition
| v2 gold/platinum or v3 silver/gold/platinum |
|
|
Term
| What does the ANSI Consensus National Standard Guide 2.0 for Design and Construction of Sustainable Buildings and Communities useful for? |
|
Definition
| Provides step by step guidance on a replicable, integrative process |
|
|
Term
| What needs to be provided to get points for the LT Credit Access to Quality Transit Option 2 Pedestrian access? |
|
Definition
|
|
Term
| What lighting controls must a shared multi occupant space have for EQ credit interior lighting? |
|
Definition
| 3 light levels. On/off/mid level. |
|
|
Term
| What percentage of students must be walkable to a school project in order for it to be eligible to earn LT Credit ? |
|
Definition
|
|
Term
| For MR Credit BPDO option option 2 optimization, what must a product's EPD demonstrate? |
|
Definition
| a reduction below industry standards in at least 3 impact categories |
|
|
Term
| Can spaces be double counted (for carpool and green vehicles) if a project is pursuing reduced parking footprint and green vehicles credit? |
|
Definition
|
|