Term
| What is Integrative Project Delivery? |
|
Definition
A process that involves all of project participants and -reduces construction time -helps cost control -better communication
is available for 1 credit point IS A PREREQ FOR HC PROJECTS |
|
|
Term
| What is the intent of the Integrative Process Credit? |
|
Definition
| -maximizes the opportunity for cost effective adoption of green design |
|
|
Term
| What are the systematic requirements? |
|
Definition
1.) identify owner's project requirements, basis of design, documents 2.)conduct a "Simple Box" energy modeling analysis to find energy reduction opportunities before design 3.) perform a preliminary water budget analysis to reduce potable water loads |
|
|
Term
| What are Preliminary Rating Goals |
|
Definition
-required for HC projects but recommended for all 1.)Have an Integrated Project Team of a minimum of 4 people 2.)Design Charrette before the schematic design phase that lasts a minimum of 4 hours |
|
|