Term
|
Definition
| assigned to identify requisitions and related documents applicable to specific projects or programs |
|
|
Term
|
Definition
| material to repair SE that is inoperative and a workaround, redundancy, or local back up is available. |
|
|
Term
|
Definition
| material to stop an AWP condition on a specific end item or component undergoing repair. |
|
|
Term
|
Definition
| material to stop an AWP condition on components and airx engines directly related to airx support; repairs for bare firewalls. |
|
|
Term
|
Definition
| "Broad Arrow" (SE Inoperative; for nonoperational SE used in direct support of operational airx for which there in no redundancy |
|
|
Term
|
Definition
| engine maintenance work stoppages for all model airx engines; NOT used for repairs for bare firewalls: see ZC8 |
|
|
Term
|
Definition
|
|
Term
|
Definition
| Support of NMC or PMC aircraft. NMCS and PMCS items, based on a valid outstanding requisition held by supply (EXREP), or work requests causing NMC or PMC conditions on aircraft, will be assigned Priority 1; also assigned to activities within 30 days of deployment. |
|
|
Term
|
Definition
| Repair of noncritical LRCAs and SE, and repair or manufacture of material for non-fixed allowance stock. |
|
|
Term
|
Definition
| Processing of salvaged material and non-aeronautical work. |
|
|
Term
| For deployed MALS, afloat and overseas IMAs, GB requisition series should only be used with ____ project code. |
|
Definition
|
|
Term
| CONUS IMAs and MALS will assign ____ series document numbers to ZF7 requirements. |
|
Definition
|
|
Term
| All activities in the Navy are assigned a FAD for determining |
|
Definition
| priorities for material support based on their mission. |
|
|
Term
| Instructions for using the material priority system and for assigning FADs are in ____ |
|
Definition
|
|
Term
| FAD is correlated with an ____ ____ ____ ____ to determine the priority assigned to requisitions. |
|
Definition
| urgency of need requirement |
|
|
Term
| Force/Activity Designator |
|
Definition
|
|
Term
| F/AD is a Roman numeral (I-V) that identifies and categorizes ____ |
|
Definition
| a force or activity on the basis of its military importance |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
| Positioned to Deploy/Combat |
|
|
Term
|
Definition
| Other Active and Selected Reserve Forces |
|
|
Term
|
Definition
|
|
Term
| The Urgency of Need Designator (UND) consists of ____ |
|
Definition
| an uppercase letter “A,” “B,” or “C.” |
|
|
Term
| It is selected to indicate ____ |
|
Definition
| the relative urgency of a force’s or activity’s need for a required item of material |
|
|
Term
| Assignment of UND is the responsibility of ____ and is derived according to ____ |
|
Definition
| the force or activity making the requisition; NAVSUP P-485 |
|
|
Term
|
Definition
| Requirement is immediate. Without material, the activity is unable to perform one or more of its primary missions. |
|
|
Term
|
Definition
| Requirement is immediate or it is known that such a requirement will occur in the immediate futureThe activity’s ability to perform one or more of its primary missions will be impaired until the material is received. |
|
|
Term
|
Definition
|
|
Term
| The ____ is used to record acceptance information, custody and transfer, rework, preservation and depreservation, TDs, and any other miscellaneous history required to accompany the SE throughout its service life. |
|
Definition
| SE Custody and Maintenance History Record (CNAF 4790/51) |
|
|
Term
| Under what circumstance shall cannibalization be performed to create a pool of RFI parts for general use to support flight operations or detachments? |
|
Definition
|
|
Term
| Authority for aircraft/equipment cannibalization between squadrons within a Type Wing/Air Wing shall be requested from ____. |
|
Definition
| the respective Wing Commander |
|
|
Term
| The approving ____ shall direct the cannibalization action via ____ to include the supporting aviation support activity as an action addressee for the required supply support action. |
|
Definition
| Wing Commander; naval message |
|
|
Term
| Authority for aircraft/equipment cannibalization between MAGs or Air Wings, or cannibalization from aircraft that have been non-mission capable in excess of 120 days, shall be requested via ____ by the requiring ____ from the respective ____. |
|
Definition
| naval message; Wing Commander; TYCOM |
|
|
Term
| COMNAVAIRFOR (N423) is the approval authority for ____ |
|
Definition
| COMNAVAIRFOR and COMNAVAIRFORES aircraft/equipment. |
|
|
Term
| COMNAVAIRSYSCOM (AIR-5.0D) is the approval authority for ____ |
|
Definition
| COMNAVAIRSYSCOM aircraft/equipment. |
|
|
Term
| CNATRA (N421) is the approval authority for ____ |
|
Definition
| CNATRA aircraft/equipment. |
|
|
Term
| Cannibalization for Broad Arrow from another site requires ____ |
|
Definition
|
|
Term
| ____ are responsible for the accurate assignment of PDs consistent with the F/AD and UND. |
|
Definition
| Commanding Officers of the requisitioning installations |
|
|
Term
| ____ shall validate F/AD I usage through the requisitioning process |
|
Definition
|
|
Term
| PDs _, _, and _ form IPG I, processing time ____. |
|
Definition
|
|
Term
| PDs _, _, _, _, and _ form IPG II, processing time ____. |
|
Definition
| 04, 05, 06, 07 and 08; 2 hours |
|
|
Term
| PDs _, _, _, _, _, _, and _ form IPG III, processing time ____. |
|
Definition
| 09, 10, 11, 12, 13, 14, and 15; 24 hours |
|
|
Term
|
Definition
| Repair Not Authorized; The activity is specifically not authorized to repair the item in applicable directives. |
|
|
Term
|
Definition
| Lack of Equipment, Tools, or Facilities; The repair is authorized but cannot be performed due to lack of equipment, tools, or facilities. |
|
|
Term
|
Definition
| Lack of Technical Skills;The repair is authorized but cannot be performed due to a lack of technical skills. |
|
|
Term
|
Definition
| Lack of Parts; Repair is authorized but cannot be performed because required parts will not be available. |
|
|
Term
|
Definition
| Fails Check and Test; The activity's authorized level of maintenance is limited to check and test only and repair is required. |
|
|
Term
|
Definition
| Lack of Technical Data; Repair is authorized but cannot be performed due to a lack of technical data. |
|
|
Term
|
Definition
| Beyond Authorized Repair Depth; Some level of repair beyond check and test is authorized, but the maintenance function required to return the item to a RFI condition is not assigned by SM&R code, MIMs, maintenance plan, or other technical decision. |
|
|
Term
|
Definition
| Administrative; Repair is authorized and feasible but not attempted due to an EI exhibit, SRC data unknown and cannot be determined, item under warranty, I-level repair costs exceed AVDLR Net Unit Price or replacement cost, excessive backlog, budgetary limitations, materials in excess of requirements, or when specifically directed by the ACC/TYCOM. |
|
|
Term
| The determination to use BCM 8 for excessive backlog will be made ____ |
|
Definition
| jointly by the maintenance and supply officers. |
|
|
Term
| BCM 8 for materials in excess of requirements or budgetary limitations require ____ |
|
Definition
|
|
Term
|
Definition
| Condemned; A repairable item is so severely worn or damaged that repair is not feasible, as determined by local maintenance personnel, or specifically directed by ACC/TYCOM. |
|
|
Term
| BCM 4 is authorized only if the action meets one of the following conditions: |
|
Definition
a. The unit requiring the material is in FAD II or higher. b. The unit requiring the material is in FAD III, but is directly supporting a deploying, deployed or forward deployed FAD II unit. |
|
|
Term
| The Aircraft Inventory Record (Equipment List) (_REF_) |
|
Definition
|
|
Term
| Naval Aircraft Flight Record (_REF_) |
|
Definition
|
|
Term
|
Definition
| Repair of critical LRCAs and SE. This priority is also assigned to O-level maintenance activity's work stoppage requirements. |
|
|
Term
| Workload Priorities Assignment Priority 1 |
|
Definition
| Support of NMC or PMC aircraft. NMCS and PMCS items, based on a valid outstanding requisition held by supply (EXREP), or work requests causing NMC or PMC conditions on aircraft, will be assigned Priority 1. This priority is also assigned to activities within 30 days of deployment. |
|
|
Term
| Workload Priorities Assignment Priority 2 |
|
Definition
| Repair of critical LRCAs and SE. This priority is also assigned to O-level maintenance activity's work stoppage requirements. |
|
|
Term
| Workload Priorities Assignment Priority 3 |
|
Definition
| Repair of noncritical LRCAs and SE, and repair or manufacture of material for nonfixed allowance stock. |
|
|
Term
| Workload Priorities Assignment Priority 4 |
|
Definition
| Processing of salvaged material and nonaeronautical work. |
|
|