Term
| Which manpower requirements measurement method is used to determine the frequency and duration of work in a work center? |
|
Definition
|
|
Term
| What unit is used to record the duration of work activities? |
|
Definition
|
|
Term
| What OA technique uses documented past performance in a work center? |
|
Definition
| Historical Records Technique |
|
|
Term
| What OA technique takes precedence over all others? |
|
Definition
| Directed Requirement Technique |
|
|
Term
| What OA technique uses estimates made by competent individuals? |
|
Definition
| Technical Estimate Technique |
|
|
Term
| Which OA technique is considered the least reliable but most used? |
|
Definition
| Technical Estimate Technique |
|
|
Term
| What OA technique uses a stopwatch to time individual events? |
|
Definition
|
|
Term
| Which OA technique provides the amount of time it takes the average worker to complete a task? |
|
Definition
|
|
Term
| What must be applied to Good Operator Times? |
|
Definition
|
|
Term
| What averaging technique uses percentages and times? |
|
Definition
|
|
Term
| Which averaging technique uses an optimistic, most often, and pessimistic estimate of time? |
|
Definition
|
|
Term
| Which averaging technique can be used when there are varying levels of complexity in a task? |
|
Definition
|
|
Term
| How is crew size used in determining the PAT? |
|
Definition
| Multiply by the frequency and duration of the activity |
|
|
Term
| In what form is all OA data presented? |
|
Definition
|
|
Term
| What is the formula for Monthly Man Hours? |
|
Definition
| Freq*Time*Crew Size*Conv*PR&D/60 |
|
|
Term
| What is the purpose of minimum manpower measurements? |
|
Definition
| To determine the minimum amount of manpower needed when the work occurs |
|
|
Term
| What kind of units are best suited for minimum manpower measurements? |
|
Definition
| Units with large amounts of standby time |
|
|
Term
| What are the factors contributing to minimum manpower? |
|
Definition
Mission Needs Performance Standards Machine Design Crew Size Safety Facility Limitations Hours of Operation Shift Size and Necessity Post-manpower Requrements Security |
|
|
Term
| What is a man-hour requirement which gives man-hour credit for required work done during other-than-duty hours? |
|
Definition
| Directed Requirement Factor (DRF) |
|
|
Term
| How does one compute the MMF for posts with equal coverage? |
|
Definition
| Multiply singular MMF by number of posts |
|
|
Term
| How does one compute MMF for posts with different coverage? |
|
Definition
|
|
Term
| What measurement method is based upon the principle that random samples will maintain the distributional characteristics of the population? |
|
Definition
|
|
Term
| What type of work sampling study is done at the category level? |
|
Definition
|
|
Term
| What type of work sampling study is done at the process level? |
|
Definition
|
|
Term
| When is work sampling most effective? |
|
Definition
Non-repetitive or irregular work Many difference processes of work Many workers in a small area |
|
|