Term
|
Definition
|
|
Term
| Who controls both water categories? |
|
Definition
|
|
Term
| When subsurface water is going to be tapped into, what permit is needed? |
|
Definition
|
|
Term
|
Definition
| Well with maximum pump capacity of 35 gallons per minute and which will water less than two acres of land. |
|
|
Term
| Notice of Intent to Drill |
|
Definition
| Submitted to Dept of Water Resources if you are going to drill an exempt well. |
|
|
Term
| Prior Appropriation of Water |
|
Definition
| Individual with the first permit for surface water controls water usage (not ownership) upstream also. Flowing water is measured in cubic feet per second. |
|
|
Term
| Riparian Rights for Water Ownership |
|
Definition
| Property adjacent to navigable body of water stops at high water line. Property next to non-navigable body of water stops at low-water line. (In deserts this is usually mid-stream.) |
|
|