Term
| D- daily, 2D- every 2 days, 3D- every 3 days, M- Monthly, 2W- every 2 weeks,W- weekly, 2M- every 2 months, Q- quarterly, S- semi annually, A- annually, 18M-every 18 months, 24M- every24 months, 30M- every30 months, 36M- every36 months, 48M-every 48 months, 60M- every 60 months, 72M- every 72 months |
|
Definition
| teh 17 different MIPS are |
|
|
Term
| R- situational requirement, ex: R-1W, U- unscheduled mainteneance |
|
Definition
| the non calandar MIPS are |
|
|
Term
| LU- Lay Up, PM- periodic maintenance , SU- start up, OT- operational test |
|
Definition
| the Inactive equipment maintenance MIPS are |
|
|
Term
| Mandatory- #, Convenience - () |
|
Definition
| the related maintenace MIPS are |
|
|
Term
| MRC ( Maintenance requirement card) |
|
Definition
| identifies who will perform PMS< and tools required |
|
|
Term
| I- portable eletronics, II- consumables, III- repair parts, IV- tools and V- miscell. |
|
Definition
| The tools , parts materials and test equipment categories are |
|
|
Term
|
Definition
| this person may authorize a suitable substitute and reschedule maintenance |
|
|
Term
| MRC, SPMIG ( standard PMS Material Identif Guide), SCAT Code |
|
Definition
| The references for tools, parts, materials, and test equipment are what |
|
|
Term
| last section of MRC, MSDS, appdendix of HMUG, HMUG |
|
Definition
| where can the hazmat, disposal info be found |
|
|
Term
|
Definition
| who should you inform that there are inaccurate data found on MRC |
|
|
Term
|
Definition
| the three color codes for MRC are what |
|
|
Term
| Technical validated MRC located in appropriate MRC desk |
|
Definition
|
|
Term
|
Definition
| this code is preliminary and provides detailed procedures for performing maintenance requirements |
|
|
Term
|
Definition
| this is classified handled in accordance with dept of navy regulation OPNAVINST 5510.1 |
|
|
Term
|
Definition
| This is only used with classified MRCs |
|
|
Term
|
Definition
| lists a number of identical equipage that applies to particular MRC. |
|
|
Term
|
Definition
| each line item on the list is a line item on the board- used when there are too many locations to list |
|
|
Term
|
Definition
| provides information necessary for equipment tag out incidentals to PMS accomplishments |
|
|
Term
|
Definition
| record of change page to LOEP, LOEP to MIPS, MIPS o MRC, MRC to equipment, equip to EGL and EGL to TGL and TGL to equipment is the order for what |
|
|
Term
|
Definition
| this has dept master pms manual, one copy of all dept mrcs, duplicate copy of all EGLS and TGLs, and scheudles |
|
|
Term
|
Definition
| this has work center pms manual, original MRCs applicable to work center, EGLS and TGLs weekly pms schedule and 13 week log |
|
|
Term
|
Definition
| form used by fleet personnel to inform TYCOM and NAVSEA of PMS matters |
|
|
Term
|
Definition
| how many cycles are there |
|
|
Term
|
Definition
| displays planned maintenance required to be performed during periods between overhauls |
|
|
Term
|
Definition
| displays planned maintenance required to be performed during periods specific 3 months |
|
|
Term
|
Definition
| located in work center and signed by Divo- displays planned maintenance required to be performed weekly |
|
|
Term
| Fully accomplished, non accomplished, partial accomplishment, recorded as satisfied, gun decking |
|
Definition
| the accomplishmnt statuses of maintenance require what |
|
|
Term
|
Definition
| maintenenance requires are X'ed off and evaluated as complete are what |
|
|
Term
|
Definition
| having no significant portion of maintenance is performed |
|
|
Term
|
Definition
| significant portion of maintenance is performed |
|
|
Term
|
Definition
| requirements was marked as satisfied by system level test |
|
|
Term
|
Definition
| intentional falsifying of a record |
|
|
Term
| 13 week PMS accountability |
|
Definition
| this requires WCS, Maintenance person and Divo signature and reasons for anything that isnt fully accomplished |
|
|
Term
|
Definition
| the purpose provides a system for collection of data concerning corrective maintenance and configuration changes |
|
|
Term
|
Definition
| used to identify equipment by number |
|
|
Term
|
Definition
| this is a consolidated list of allowances of repair parts and equipage |
|
|
Term
| AEL ( allowance equipage list) and APL ( Allowance Part List) |
|
Definition
| the COSAL is made of these two things |
|
|
Term
|
Definition
| this is used to order tools, parts and materials, through NAVSUP 1250-1 and DD1348 |
|
|
Term
|
Definition
| this MDS Form is a MAF reporting completions of corrective or deferred maintenace that DO NOT reusult in - configuration changes |
|
|
Term
|
Definition
| these MAF are supplemental forms such as sketches and drawings |
|
|
Term
|
Definition
| these MAF are configuration change form reporting any action which results in Configuration change or update changes to COSAL |
|
|
Term
|
Definition
| used to keep track of problems in work center. verify CSMP |
|
|
Term
| CSMP (Current Ship Maintenance Project) |
|
Definition
| current list of all known material problems on ship. provides shipboard maintenance managers with consolidated listing of deferred maintenance |
|
|
Term
| Deferral of 2K, Completion of Prev Deferred 2K, Completion and Configuration Change |
|
Definition
|
|
Term
|
Definition
| this is maintenance action used for insurv deficiences, outside assistance required 30 days or longer |
|
|
Term
| Completion of Prev Deferred 2K |
|
Definition
| clears items job offs the CSMP, , places it into material history file and accountability |
|
|
Term
|
Definition
| account for time and material, provide history |
|
|
Term
|
Definition
| changes to ships configuration, add/delete items from COSAL, add Items to LOEP |
|
|
Term
|
Definition
| this provides safety measures for equipment and personnel for prevention of improper operations of equipment |
|
|
Term
|
Definition
| equipment down and tagged for repair uses this type of Tag Out procedure |
|
|
Term
|
Definition
| performing routine PMS checks |
|
|
Term
|
Definition
| person responsible for SAFETY of Entire Ship |
|
|
Term
|
Definition
| person ensures compliance with Command tag out log |
|
|
Term
| Repair Activity Representative |
|
Definition
| ensures compliance with tag out log procedures between repair and tender personnel |
|
|
Term
|
Definition
| ensures compliance with tag out procedures among departmental level |
|
|
Term
|
Definition
| Person with authority to sign issue or clear tags and labels |
|
|
Term
|
Definition
| develops, issues, and conducts daily inventory of WC PMS and tags |
|
|
Term
| Petty Officer in Charge of Work |
|
Definition
| fills out record sheet, prepares tags, places all valves ,switches, components, in authorized position |
|
|
Term
|
Definition
| person fully acknowledgeable of equipment being tagged and who after INDEPENDANT verification indicates satisfaction |
|
|
Term
|
Definition
| YELLOW and serves as precaution..must have 3 people ( 1st Person, 2nd Person and Authorizing Officer) to sign it |
|
|
Term
|
Definition
| RED tag prohibits operations of the equipment that could endanger personnel |
|
|
Term
|
Definition
| RED LABEL used to identify instruments that will not correctly indicate parameteres because they are defective |
|
|
Term
|
Definition
| ORANGE LABEL used to identify instruments that are out of calibration |
|
|
Term
| Danger/ CAUTION Tag Out REcord SHeet |
|
Definition
| reference of existing tag out to ensure that serial numbers are ISSUED SEQUENTIALLY and to assist in conducting audits |
|
|
Term
|
Definition
| a record of out of COmmisision/Out of Calibration labels that is maintained |
|
|
Term
|
Definition
| identifies information necessary to properly and effectively place tags to prevent IMPROPER operations when something is isolated for PMS |
|
|
Term
|
Definition
| LAMINATED TAG and is REPEAT USABLE and authorized only for designated PMS maintenance excludes participation of 2 or more WC and require more than one work day |
|
|
Term
|
Definition
this has :A) copy of ships tag out bill B) index/ audit record sheet C) Active tag out record sheet D) Inactive/ completed tag our records sheets E) Instrument Log |
|
|
Term
| PMS Red Tag Record Contents |
|
Definition
this has: A) Copy of equipment tag out instructions B) WC PMS red tag record C)Laminated Tag guide list D) laminated red tags |
|
|
Term
| Ensures permission has bene granted for Tag Out, ensures notification of principles/ tech assistant, Notify DCC, Notify DDO or EOOW, review record sheets and tags for ADEQUACY |
|
Definition
| these are procedures for Authorizing Ofcier prior to Tag Out |
|
|
Term
|
Definition
| WCS will conduct a daily inventory of all work centers PMS red tags and DIVO will conduct weekly audits and initial records |
|
|